Space Launch System
8 reportsThe strongest reporting on Space Launch System separates flight record; reusability or mission architecture; and stage and propulsion design. The discussion asks what can be established from independent reliability statistics about reusability or mission architecture and whether a compatible result appears in launch telemetry; the evidence cannot remove the concern that planned performance and advertised capacity do not replace demonstrated flights.
Blue Origin rocket blast detected over 1600 kilometers from Cape Canaveral
A Blue Origin New Glenn rocket explosion at Cape Canaveral produced infrasound waves detected more than 1600 kilometers away. Researchers used specialized sensors to estimate the blast's energy and assess its impact on launch operations and future missions.
NASA's Super Guppy Transformed Space Hardware Transport in 1965
NASA's Super Guppy cargo aircraft completed its first test flight in 1965, enabling the agency to move oversized rocket stages and spacecraft components across the United States for missions including Apollo and Artemis
How NASA Mechanics Maintain Spacecraft and Support Exploration
NASA relies on highly trained mechanics to keep spacecraft, launch vehicles, and support equipment operational. Their work spans aircraft, rockets, and heavy transporters, requiring specialized skills and rigorous certification.
Hydrogen-Powered Car Sets 406 km/h Land Speed Record in Utah
A hydrogen-fueled vehicle has achieved a new land speed record, reaching an average of 406 km/h during controlled runs at the Bonneville Salt Flats, demonstrating the potential of hydrogen combustion engines for high-performance applications
NASA Artemis Launch Team Welcomes New Test Project Engineer
NASA's Artemis program has added Lindsey Waitt as a test project engineer, supporting launch operations for upcoming Moon missions. Her appointment highlights the technical demands and collaborative environment of Artemis launch preparations.
NASA Joins Artemis III Orion Crew and Service Modules for Lunar Mission
Technicians at Kennedy Space Center have integrated the Orion crew and service modules for Artemis III, a key milestone ahead of the mission to test lunar landing system rendezvous and docking in lunar orbit
NASA Moves Artemis IV Hydrogen Tank for Core Stage Testing
A 130-foot liquid hydrogen tank for Artemis IV was transported at NASA's Michoud Assembly Facility, marking a key step toward core stage testing for the Space Launch System rocket
Artemis III to Test NASA's Most Complex Multi-Spacecraft Mission Yet
NASA's Artemis III mission will attempt a coordinated two-week operation involving four astronauts and three independently launched spacecraft, aiming to validate critical lunar landing technologies in low Earth orbit